Things have been very busy here with the last of the big batch of Cambridge oars being completed and the setting up of the much larger new workshop. I’m also trying to renovate a house at the same time, so I’m going a bit bonkers.
The building is long and narrow – ideal for repairing sculls – and now has 7.5m of work benches along one side. So that I can tackle more jobs in a more efficient way, each bench has had a few features built in. The dust extraction system is next, but for now I just need the new window for the end of the building to arrive so that I can actually get something like a single scull inside!
On the completed job front, here are two recently finished oars. Each was painted to match the style of other existing oars, and as a consequence they were each a bit of a challenge. Imagine trying to copy another person’s handwriting.